★★★★★ 5 Star Rated 15+ Years Estimating $1M PI Insurance No Lock-In Contracts Australia-Wide · Fully Remote
(08) 6156 9550eagle_enquiries@outlook.com
Home All Services How It Works Pricing Calculator Blog About FAQ Service Areas

Concrete

Concrete Estimating Decorative Concrete Brick Paving

Trades

Earthworks Estimating Bricklaying Estimating Carpentry Estimating Plumbing Estimating Electrical Estimating Roofing Estimating Civil Estimating Landscaping Estimating Termite Treatment

Finishes & Linings

Plastering Estimating Painting Estimating Tiling Estimating Waterproofing Estimating Ceilings Estimating Insulation Estimating Texture Coating Blinds Estimating

Deliverables

Quantity Takeoff & BOQ Construction Programs Progress Claims & Variations Sub-Contract Reviews Residential Estimating Commercial Estimating Industrial Estimating Get a Quote
Finishes & Linings · Australia-Wide

Tiling Estimating & Tile Counts

Floor and wall areas measured room by room, converted to box counts at the specified tile size, with waste set by the lay pattern rather than a flat ten per cent.

15+
Years Estimating
20+
Trades Covered
24hr
Turnaround
$1M
PI Insurance
Free
First Estimate
✓ First estimate free
✓ 24hr turnaround on most residential jobs
✓ $1M professional indemnity cover
✓ No lock-in contracts
✓ Tax deductible
Why It Is Different

Waste follows the pattern, not a rule of thumb

Ten per cent waste is the default and it is right about half the time. A straight lay in a square room needs less; a diagonal lay, a herringbone, or a large-format tile in a room with awkward dimensions needs considerably more.

We set the waste allowance off the lay pattern and the room geometry, then convert area to box counts at the tile size specified — so you order boxes, not square metres, and you order the right number of them.

The Scope

What we do on a tiling job

Floors are measured room by room, with the tile size, lay pattern and any border or feature area kept separate. Walls are measured by wet area with the tile height taken off the sections or the interior elevations, because full-height and part-height tiling are very different quantities.

Areas convert to box counts at the specified tile size, with waste set by pattern and room geometry. Substrate preparation is measured separately — screed, self-levelling compound and sheet underlay each by area — since the preparation often costs more than the tiling on a renovation.

Then the consumables and trims: adhesive by area and bed thickness, grout by area and joint width, silicone by the metre, tile trims and edge profiles by the metre by type, and movement joints where the area or the substrate demands them.

Line By Line

Every item measured, and why it matters

Nothing here is an allowance. Each line is measured off your drawings in its own unit, so you can check it against the plan yourself.

What a tiling estimate covers
ItemHow it is measuredWhy it matters
Floor areaRoom by room, by tile size and lay patternDifferent tiles in different rooms means different rates and different waste
Wall areaBy wet area, with tile height off the sectionsFull-height and part-height tiling in the same bathroom are separate quantities
Waste allowanceSet by lay pattern and room geometry, shown as its own lineA diagonal or herringbone lay can need twice the waste of a straight lay
Box countArea plus waste converted to boxes at the tile sizeTiles come in boxes and dye lots — ordering short mid-job is a real problem
Substrate preparationScreed, levelling compound or underlay by areaOn a renovation this regularly exceeds the cost of the tiling
AdhesiveBy area and bed thickness, by adhesive classLarge-format tiles need a thicker bed and more adhesive per square metre
Grout and siliconeGrout by area and joint width, silicone by the metreJoint width changes grout volume more than tile size does
Trims and profilesLinear metres by type — edge, step, transition, movementTrims are detailed work and easy to leave out of a fast price
Cutting and penetrationsCounted individually: outlets, wastes, tap holes, mitresEvery penetration is a cut, and mitred external corners are slow
The Detail

How the lay pattern changes waste

How the lay pattern changes waste
Lay patternTypical waste allowanceWhy
Straight / stack bondAround 5–10%Cuts are mostly on two edges
Brick / offset bondAround 10%Half tiles at row ends, mostly reusable
DiagonalAround 15%Every perimeter tile is a raking cut
HerringboneAround 15–20%Heavy cutting at every boundary
Large formatAround 10–15%Offcuts are too big to reuse and breakage is costlier
Mosaic sheetsAround 5–10%Cuts land on joints, so waste stays low

Preparation is the hidden half of a renovation

On a new build the substrate arrives ready. On a renovation you may be dealing with an out-of-level floor, an old adhesive bed, or a sheet floor that needs replacing before a tile goes down — and that work can cost more than the tiling.

We measure preparation as its own set of lines by area, and where we are working from drawings rather than a site visit we state what we have assumed about the existing substrate, so you know exactly what to check.

How It Works

From your plans to a priced spreadsheet

The same five steps on every job, whether it is a single slab or a full tender package.

  1. Send us the plans

    Email the architectural and structural drawings, the specification and the scope of works in whatever format you have — PDF, DWG, or photos of a marked-up set. If something is missing we will tell you before we start, not after.

  2. We measure the tiling scope

    Floors are measured room by room, with the tile size, lay pattern and any border or feature area kept separate. Walls are measured by wet area with the tile height taken off the sections or the interior elevations, because full-height and part-height tiling are very different quantities.

  3. Colour-coded markup you can actually check

    Every measured item gets its own colour and legend entry on the drawing. When the takeoff comes back you can see exactly what was counted and what was not, so you are never asked to trust a number you cannot trace. This is the part clients tell us they did not know they needed until they had it.

  4. A live Excel sheet with your own rates in it

    The takeoff is delivered as a working spreadsheet, not a locked PDF. Your rates sit in their own column, so you can change a supply price or a labour rate and watch the total move. Plug in your own numbers and the sheet is yours to reuse on the next job.

  5. Cross-check, then deliver

    Quantities are re-measured independently and cross-checked against the drawing before anything leaves here. You get the marked-up plans, the priced spreadsheet and a plain-English note on anything we flagged as unclear or excluded.

You keep the working file

The takeoff arrives as a live Excel spreadsheet with the colour-coded marked-up plans beside it. Your rates go in your own column, so you can plug in your own supply and labour numbers and reuse the sheet on the next job. Nothing is locked.

What it costs

First estimate free. After that the fee is confirmed in writing as a fixed amount before any work starts. No retainer, no subscription, no lock-in contract. Full pricing detail here →

Typical Work

Tiling we price every week

Waterproofing and tiling are two trades on one program

In wet areas the tiling sits on a waterproof membrane that has its own standard, its own inspection and its own cure time. Whether you are doing that work or someone else is, it has to be on the program, and if it is in your scope it has to be in your price.

We keep waterproofing on its own lines with the membrane area, bond breakers and angle fillets measured separately, so the two scopes never get blurred into one square metre rate. Our waterproofing estimating page covers it in detail.

Standards

What we measure against

Quantities are measured against the standards and the specification for your job. Where a drawing and a standard disagree, we flag it rather than quietly picking one.

Australian Standards referenced on tiling work
StandardCoversRelevance
AS 3958Ceramic tiles — guide to installationSubstrate, adhesive and installation requirements
AS 3740Waterproofing of domestic wet areasMembrane requirements under and behind tiles
AS 4586Slip resistance classificationSlip rating for floor tiles in wet and public areas
Costly Mistakes

Where tiling quotes usually go wrong

None of these are unusual. They are the things that get missed when a quote is put together at 9pm after a full day on the tools.

FAQ

Tiling estimating questions

If your question is not here, email it through and you will get a straight answer, not a sales call.

It depends on the lay pattern and the room shape, and it appears as its own visible line. A straight lay in a square room sits around five to ten per cent; a diagonal or herringbone lay sits closer to fifteen or twenty.

If you have a figure that has proven right on your own jobs, tell us and we will use yours instead.

Yes, converted at the specified tile size after waste is added. Tiles come in boxes and in dye lots, so ordering to the right box count matters more than knowing the square metres.

All of them. Adhesive by area and bed thickness against the adhesive class, grout by area and joint width, and silicone by the metre. Joint width affects grout volume more than most people expect, so it is calculated rather than allowed for.

Yes, as separate lines — membrane area, bond breakers and angle fillets by the metre, and primer. It is a different standard and a different scope to tiling, so it never gets blended into a tiling rate.

Yes, measured as its own set of lines: screed, levelling compound, sheet underlay and any strip-out. Where we are working from drawings we state the substrate condition we assumed so you know what to verify on site.

The floor plan, the interior elevations or sections for tile heights, and the finishes schedule with the tile sizes and lay patterns. If the tile is not selected yet, tell us the likely size and we will note it as an assumption.

Most residential tiling packages come back within 24 hours of the plans arriving. Larger commercial packages take longer — we confirm the timing before starting.

Related

Other trades and deliverables

Most jobs cross more than one trade. We can price the whole package in one spreadsheet.

See all 20+ trades we estimate →

Send through your tiling plans

Your first estimate is free. Email the drawings and the scope, and you will have a marked-up takeoff and a priced spreadsheet back within 24 hours on most residential jobs. Prefer to talk first? Reply with "KEEN" and your number.

Get My Free Estimate →